Master's Thesis: Secure IT/OT Convergence in Network-Centric Control Architectures
Open, no deadline listed
- Type
- Thesis, Software
- Who can apply
- On the posting.
- Applications
- Open, no deadline listed
- Hiring process
- How ABB describes it for all roles: Apply with your CV, academic transcripts and a cover letter in English. “Positions are filled continuously.” ABB's general steps: possibly a video interview or assessment first, then “a series of interviews with HR and hiring managers”. After the interviews you get feedback; if that and the compliance checks are positive, you get an offer. Some thesis postings call themselves part of a talent pipeline rather than an active opening.
From abb.wd3.myworkdayjobs.com (opens in a new tab), added from the job board on 24 Nov 2026, not checked by hand yet. Dates and rules can change, so check the posting before you apply. Something wrong? (opens in a new tab)
How ABB hires in general, the pay it names and what candidates reported: ABB page.
Applied for this one? Tell the next person how it went. It takes a minute.
More roles at ABB
- THESIS WORK: VERIFICATION, MAINTENANCE AND UPGRADE OF THE STRESSOMETER SYSTEM TEST ENVIRONMENTRolling
- Master Thesis Work - Industrializing e-SBOM Traceability across DevOps, Windchill and Product Lifecycle SystemsOpen
- Thesis Work: Physical AI Through Simulation-Driven Learning and Planning for Industrial RobotsOpen
- Thesis Work -Depth-Aware Physical AI Models for Robot ManipulationOpen
- Thesis work - Learning Robot-Individual Physics-Models from Calibration Data and Test MeasurementsOpen